Sampling for a remodel
Think of the job’s footprint. Pulling out a kitchen means sampling its ceiling, the wall behind the cabinets and each floor layer, and widening the plan to the hallway adds the hallway’s materials to the list.
Typical cost in Eagan
Looking at a ceiling or floor tells you nothing about asbestos, and neither does the year your house was built. A lab does. Small samples are cut by an MDH-certified inspector from each surface the project will touch, an accredited lab reports on every one, and we plan and price removal from those results.
We arrange testing in Eagan, Inver Grove Heights and West St. Paul, whether you own a detached house, a townhome or a rental building.

Think of the job’s footprint. Pulling out a kitchen means sampling its ceiling, the wall behind the cabinets and each floor layer, and widening the plan to the hallway adds the hallway’s materials to the list.
Demolition widens the survey to the entire building. MPCA requires an MDH-certified inspector to go through every structure before it comes down, roofing and siding included.
The lab holds NVLAP or AIHA accreditation. Minnesota’s cutoff for asbestos-containing material is anything above 1 percent.
This one matters in Eagan, where the median home was built in 1988. MDH will take a written statement from the architect or contractor confirming no asbestos went into the building, provided construction finished after October 1988, and then no inspection is needed.
If you live in the house and hire a contractor for the remodel, a contractor with employees must survey first under the worker-safety rule. Sampling is still the only way to know what the work will disturb.
Contractors with employees fall under a worker-safety rule. Before the crew remodels, restores or demolishes anything that may contain asbestos, the company needs a survey by a qualified person.
Offices, stores, schools and other public or commercial buildings are a separate case, and the year they went up makes no difference. Each one is inspected before renovation or demolition.
The lab report becomes the basis of our plan. If the job disturbs friable pipe wrap running more than 10 linear feet, more than 6 square feet of friable material on another surface, or, when length and area can’t be measured, more than 1 cubic foot, the removal is licensed work for a contractor that holds an MDH asbestos license.

If the lab report is back and the ceiling texture tested positive, popcorn ceiling removal explains the next step, and our main page covers everything else.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (651) 504-8498